Team Pain was the design consultant for the actual skate park which included public input sessions. Our team redesigned the park bowl area to work with the existing drain lines which resulted in two separate bowls. Additionally, we used the new elevations to add embankments and stairs to complement the street area. The concrete slab which originally had the above ground ramps was a “post tension slab” which could not be removed, so we utilized our own Skate Art pieces to dress it up with true and unique street elements and added a complementing quarter pipe at the opposite end of the park to add to that flow. The park was very well received by the local skate community and the City was very glad to have chosen our team to provide them with the best solution and return on their investment.